 
				The airport and the Peninsula
 The airport is the last large free space on the Cap-Vert Peninsula. Urban development has ceased at the walls along its runways.
 This void is an excellent opportunity for creating an urban hub homologous to the plateau in the north of the Peninsula.
 The project has two goals:
 Create an emblematic city symbolised by the Cité des Affaires de l'Afrique de l'Ouest
 Ensure a harmonious link with the surrounding districts by prolonging the traditional city.
																						
								Studies : 
								2018													
Urban Development Master Plan for the Cité des Affaires de l'Afrique de l'Ouest in Dakar.
 • Definition of an overall development strategy
 • Drawing up an Urban Development Master Plan
 • Finalisation of the Master Plan and proposal of an action plan
Project Owner
 CDG / CDC / APIX - SA
Project Supervision
 Reichen et Robert & Associés International
 Landscaping: TER
 Technical Design Office, mobility and urban design: Roland Ribi & Associés
 Planner: Polyprogramme
Area
 Site area: 600 ha
 Subdivided area: 435 ha (73%)
 Net floor area developed: 4,150,000 m²
 Floor Area Ratio: 0.7
 1- CENTRAL PARK: 84 ha
 2- CITÉ DES AFFAIRES: 37 ha
 3- NORTHWEST: 46 ha
 4- NORTHEAST: 45 ha
 5- SOUTHWEST: 79 ha
 6- SOUTHEAST: 132 ha
 7- EAST RUNWAY: 174 ha
 TOTAL, DISTRICTS: 597 ha
Perspectives
Kaupunki
 
				 
				 
				 
				 
				 
				 
				 
				