				The first major operation in the Nice Méridia district, along the Avenue Paul Montel.
 This project is in line with the Eco Vallée de la Plaine du Var development project.
																						
								Delivery : 
								2010													
Mission de maîtrise d’œuvre
Project owner
 Cogedim and Icade
Architects
Reichen et Robert & Associés
 
 Co-contractor(s)
 Lead contractor, Technical Design Office, all trades: SUDEQUIP
 Health and Safety Coordinator and Inspection Bureau: APAVE
 Assistant to Project Owner, HQE: GREEN AFFAIR
 Landscaping: François Navarro
 Technical Design Office, concrete: SETI
Area: 10,000 m² net floor area
Project value
€15.6 M tax excluded
Environmental certification: Tertiary HQE
Perspective
 ©Platform
Photographer
 ©Griesser
 ©Jacques Gelez
 
				 
				