				Construction of an office building for Alstom Power Centrales. The building adheres to the HQE guidelines. The building comprises five levels of offices (ground floor + 4 stories) above an underground car park with 100 spaces. The five office levels are accessible via the main hall located at the southeast corner of the building via a large interior street open to all five levels. This street is lit by broad curtain walls opening on interior patios and by skylights punctuating the roof. The street is punctuated by walkways and two high vegetated walls which animate the interior street, one in contact with the main entry hall and the other at the end of the perspective, providing an 18 m height for the wall.
																						
								Delivery : 
								2010													
Project supervision commission
Project owner
 Sempat
Architects
Reichen et Robert & Associés
 Construction architect
Atelier Cevirgen
 
 Co-contractor(s)
 Structural design office: Santini ingenierie
 Electrical design office: Enebat
 Fluids design office: Henry
 Technical inspection: Véritas
 Health and Safety Coordinator: ATR
 Roadways and utility networks: BEJ
 Construction management: Triau
 HQE design office: Cap Terre
Area
15,000 m² net floor area
 
 Project value
€21 M tax excluded (excluding roadways and utility networks)
Environmental certification (HQE)
 RT2005 thermal regulation - compliant with HPE 2005 label
 HQE certification by Certivéa: NF Tertiary Building HQE certification