				Project supervision for extension of the Boulevards des Maréchaux tramway from the Porte des Lilas to the Porte de la Chapelle. Construction of a bridge over the Canal de l'Ourcq
 Creation of three transport hubs:
 - Porte de la Villette
 - Porte de Pantin
 - Porte de la Chapelle
 Creation of a tramway bridge in the context of the extension of the tramway line along the Boulevards des Maréchaux.
																						
								Delivery : 
								2012													
Mission de maîtrise d'oeuvre des espaces publics
 Project owner
 City of Paris
Project supervision
 Lead contractor: Setec TPI
 Reichen et Robert & Associés
 Landscaping: Pena & Pena
 Lighting designer: Concepto
Site area
 Length of line: 14 km total
 The studies concern 6 km
 Public space: 369,224 m²
 Total length of the engineering works, including 290 m access ramp with a 110 m central span.
 Width: 14 m
Project value
 €122 M tax excluded
Photographers
Caroline Sattler, Bernard Reichen, Wogencky
 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
						 
						